Aboutthis project
Client: Pepsi
Designer: PM Group
This project was delivered within an existing food production factory boilerhouse to enable the installation of a new boiler skid to augment existing hot water generation capacity for the facility. Project scope included the construction of an extension to existing pipe trenches, the installation of steel pipe trench gratings, pipework supports, roof opes, and access platform to facilitate access to boiler flue for environmental testing.