Aboutthis project

Client: Colaiste an Spioraid Naoimh

Designer: Murphy McCarthy Consulting Engineers

Replacement of existing 100mm ring distribution Watermain and combined sewer system serving a Secondary School facility.
Aggressive schedule required the works to be completed during school Summer Holiday period.

Scope included the following headline items:

  • 350 lin.m of 110mm HDPE Watermain by trenchless pipe installation methods.
  • Installation of Fire Hydrant, Sluice Valve and service connections to watermain
  • 270 lin.m of 150mm dia. sewer pipe
  • Stormwater gullies and storm and foul connections to existing services